| | LinkBack (61) | Thread Tools | Display Modes |
| | #811 |
| Dateline Disneylander and MiceAge Columnist ![]() ![]() ![]() ![]() ![]() Join Date: Jan 2005 Location: Bakersfield, California
Posts: 7,560
![]() | Re: Disney's California Adventure Project Tracker II They will eventually. Right now the focus is on the Games of the Boardwalk... |
| | |
| | #812 |
| Done waiting!! Join Date: Feb 2007
Posts: 803
![]() | Re: Disney's California Adventure Project Tracker II So I'm guessing that they'll just be painting the wheel in wedges and then rotating it to work on the next segment. That would explain how reinforced the scaffolding is out into the (dry) bay. It can't be attached to the wheel if the wheel needs to turn. No matter what though there's no way you could get me out on that scaffolding!
__________________ I'm literally a born Disney fan! I was born at Providence St. Joseph Med Center right across the street from Disney Studios in Burbank. The same hospital where Walt died. By the way my shirt in the pic says "I like big sharks and I cannot lie" |
| | |
| | #813 |
| Addicted to Disneyhol Join Date: Jan 2008 Location: So Cal
Posts: 98
![]() | Re: Disney's California Adventure Project Tracker II I don't know about that.^ When I was there on Friday, there was scaffolding going through the wheel, so unless they plan on removing those to rotate it, they are probably going to just work their way up. And there are probably safety issues with moving it with all the scaffolding there. |
| | |
| | #814 |
| Haunted Mansion Fan ![]() Join Date: Jun 2008 Location: Haunted Mansion
Posts: 1,279
![]() | Re: Disney's California Adventure Project Tracker II They sure seem to be taking their time to remove the sun face. |
| | |
| | #815 |
| Minion ![]() ![]() ![]() Join Date: Jan 2008 Location: Los Angeles
Posts: 3,080
![]() | Re: Disney's California Adventure Project Tracker II It will come down at an appropriate time based on the order that they need to get things done. They're not taking their time, they are probably trying to have a crane on site for the least amount of time possible. So when they are ready to do eveything they'll need the crane for, they'll take down the sun. Most likely, they'll also put the Mickey in place right away too so the crane can be done and move on. Each day a crane is on site is expensive. |
| | |
| | #816 |
| Lovin the Magic since '79 ![]() ![]() ![]() ![]() ![]() Join Date: Aug 2006 Location: Too Far From Disneyland
Posts: 6,090
![]() | Re: Disney's California Adventure Project Tracker II Good chance they may take down the orange as well on those days.
__________________ ![]() Next Trips: June 2010, October 2010, December 2011 |
| | |
| | #817 |
| Suspended ![]() ![]() Join Date: Jul 2007
Posts: 2,660
![]() | |
| | |
| | #818 |
| Haunted Mansion Fan ![]() Join Date: Jun 2008 Location: Haunted Mansion
Posts: 1,279
![]() | |
| | |
| | #819 |
| is too darn hot. ![]() ![]() ![]() ![]() ![]() Join Date: Mar 2007 Location: It's all about the LBC, yo!
Posts: 13,988
![]() | |
| | |
| | #820 |
| Haunted Mansion Fan ![]() Join Date: Jun 2008 Location: Haunted Mansion
Posts: 1,279
![]() | |
| | |
| | #821 |
| Where Dreams Come True! ![]() ![]() ![]() Join Date: Aug 2006 Location: Over by Main Street, through International Street, into Edison Square.
Posts: 3,407
![]() | Re: Disney's California Adventure Project Tracker II Who's being negative. Thank goodness they are taking their time. The later the better to me.
__________________ ![]() I'm Celebrating the Return of a Real Parade this November! Celebrate Today and Everyday! Mint Julep Addict: Dole Whip Lover: #1 Fan of Golden Dreams: Fireworks Lover A Parade Junkie: Constant MatterCam User: Avid Photographer: Loves DCA Smoothies |
| | |
| | #822 | |
| Not an Annual pAssholder ![]() ![]() Join Date: Jun 2006 Location: 4 miles from DL
Posts: 2,121
![]() | Re: Disney's California Adventure Project Tracker II Quote:
As for the scaffolding, they only need to cover half the wheel; all they need to do is rotate the wheel when the section is done. For the slats going through the wheel, they just take them out when its rotated. Common sense!
__________________ So much for moving ahead.... "Save [insert attraction/show]" " Bring back [insert dead attraction/show]". | |
| | |
| | #823 |
| Dateline Disneylander and MiceAge Columnist ![]() ![]() ![]() ![]() ![]() Join Date: Jan 2005 Location: Bakersfield, California
Posts: 7,560
![]() | Re: Disney's California Adventure Project Tracker II The Epcot wand didn't require the time it took to drain Paradise Bay, nor did they need to build scaffolding for the Epcot wand removal -- it was all done by crane. |
| | |
| | #824 |
| Member ![]() ![]() Join Date: Jun 2005
Posts: 2,753
![]() | Re: Disney's California Adventure Project Tracker II whats the rush to have the sun face taken down anyway? There is still plenty of other work that is being done. Besides the mickey face will probably be one of the last things they install. |
| | |
| | #825 |
| Nyum Nyum Nyum Nyum ![]() ![]() Join Date: Jun 2005 Location: North Tustin
Posts: 2,734
![]() | |
| | |
![]() |
| Bookmarks |
| Thread Tools | |
| Display Modes | |
| |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
Disney's California Adventure Project Tracker VI | MasterGracey | Disneyland Resort | 2032 | 08-12-2009 12:22 PM |
Disney's California Adventure Project Tracker V | MasterGracey | Disneyland Resort | 2008 | 06-30-2009 10:09 AM |
Disney's California Adventure Project Tracker IV | MasterGracey | Disneyland Resort | 2018 | 05-03-2009 07:37 PM |
Disney's California Adventure Project Tracker III | MasterGracey | Disneyland Resort | 2074 | 04-04-2009 04:12 AM |
Disney's California Adventure Project Tracker | MasterGracey | Disneyland Resort | 2043 | 10-10-2008 11:12 PM |