Page 1 of 663 1234112651101501 ... LastLast
Results 1 to 15 of 9945
  1. #1

    • MiceAge Columnist
    • Dateline Disneylander
    • Offline

    Join Date
    Jan 2005
    Location
    Disneyland, U.S.A.
    Posts
    8,138

    Disney California Adventure Project Tracker X


    CHECK BACK OFTEN! This thread is updated whenever new information is available!

    Track the progress from the beginning! Browse the first nine DCA Project Trackers here:



    Follow us on
    Stay in the loop! Get Disneyland Project Tracker, DCA Project Tracker, and Dateline Disneyland updates instantly! Twitter.com/DatelineDisney
    Information sources:
    Disneyland Resort Press Releases, MiceAge.com, Blue Sky Disney, LA Times Funland Blog, OC Register Around Disney Blog, and special contributors.
    If you have any new information, please reply and provide your source or send me a private message. Thanks.


    Looking for Concept Art?
    Galleries:
    These handy galleries contain much of the various concept art that has been released and leaked.



    BUENA VISTA STREET
    Overall Project: Retheming of Sunshine Plaza into Buena Vista Street (originally planned to be called Walt Disney Plaza). New park icon, the Carthay Circle Theatre, Red Car Trolley transportation system, and various shops and restaurants.
    Project Status: This project has gone through several false starts and re-schedulings including an early 2009, September 2011, and late 2010 start dates. On February 23, 2010, Al Lutz reported the project, scheduled to start in October 2010, began September 9 when removal of the Sunshine Plaza sun icon began, followed by the demolition of the tile murals on September 13. Construction will last for 18 months.
    Open Date: April/Spring 2012

    Performance Corridor closure & Pixar Play Parade hiatus
    Details: Due to construction, DCA's performance corridor will be closed in varying degrees throughout 2011, including a complete closure of a large section of the thoroughfare starting in June 2011. Due to this, the Pixar Play Parade will be on hiatus for much of the year. Smaller "pop-up" shows will be used to offer entertainment during the parade's hiatus.
    Project Status: Starting January 4, construction walls in Sunshine Plaza will be extended further, resulting in a tighter walkway through the park's entrance plaza. The Pixar Play Parade will go on hiatus January 4, which is expected to last until November. During this time, smaller "Pixar Pop-Up" shows will entertain guests elsewhere in the park in lieu of a full parade.
    New main entry turnstiles
    Details: The current main entry turnstiles to Disney's California Adventure and the CALIFORNIA letters will be removed and new turnstiles/gate styled after Los Angeles' Pan Pacific Auditorium will be constructed in the current location of the CALIFORNIA letters.
    Project Status: To begin early 2011.
    Open Date: August 29, 2011.

    CALIFORNIA letter removal
    Details: The DisneyParks Blog announced on December 9 that the removal of the CALIFORNIA letters would be removed starting January 4, 2011.
    Project Status: To begin January 4, 2011.
    Completion Date: Early 2011.

    New facades, shops and dining
    Details: A new Main Street-esque street will house new shops and dining, replacing the tile murals, restrooms, lockers, and Guest Services/AP Processing buildings. The new shop facades will feature nods to Walt Disney's rich life history on shop windows, including "Elias & Co. Dept. Store" and "Oswald’s Gas & Oil." For more information, see this post.
    Project Status: Demolition of murals and other original Sunshine Plaza theming began in 2010. Work on retheming the buildings will begin in 2011.
    Open Date: By spring/summer 2012
    Baker's Field Bakery, Bur-r-r Bank Bakery, and Engine-Ears Toys closing
    Details: The shops and restaurants on Sunshine Plaza's west side will close to be reworked and renamed to fit the new Buena Vista Street theme.
    Project Status: Shops and dining close July 31, 2011
    Open Date: By spring/summer 2012
    Temporary Park Entrance
    Details: The on-again-off-again temporary park entrance at the utility entrance between Soarin' Over California and the Grand Californian Hotel is back on, according to the OC Register's Around Disney blog. Previously expected to be the main entry point for the park while the entire main entrance was closed for construction, the corridor will now serve as a mere detour as guests enter through the park's current main entrance and then take a backstage route that empties between Soarin' and the Grand Californian.
    Project Status: Temporary entrance rerouting begins August 29, 2011.
    Open Date: August 29, 2011.
    Carthay Theatre / Walt Disney Story
    Details: The Walt Disney Story attraction is reportedly cancelled. Carthay Theatre building will be built, however, and is scheduled to house a relocated Resort Preview Center.
    Project Status: To begin 2010
    Open Date: By spring/summer 2012
    Red Car Trolley transportation system
    Project Status: To begin 2010
    Open Date: By spring/summer 2012
    Disney Channel Rocks! show
    Details: High School Musical 3 moving stage show will be replaced with a new show featuring music from Disney Channel hits including High School Musical, Camp Rock, and StarStruck. The show, previously expected to utilize the High School Musical 3 rolling stage, takes place on the Palisades Stage in Paradise Park. Disney announced the new show on the DisneyParks Blog on July 29, 2010.
    Project Status: Now open.
    Open Date: Originally set to open October 22, it was delayed until November 26, 2010.
    Disney's Electrical Parade enhancements
    Details: A new Tinkerbell lead float will replace the Blue Fairy and Snow White and Pinocchio units will return to the parade along with an updated soundtrack and a new "pixie dust" lighting effects on all floats.
    Project Status: Completed.
    Open Date: June 12, 2009
    High School Musical 3: Right Here! Right Now! show
    Details: High School Musical 2 moving stage show cancelled. A new moving stage show based on High School Musical 3 will replace the old show.
    Project Status: Now open.
    Open Date: Debuted October 24




    HOLLYWOODLAND
    Overall Project: Utilizing Stage 17 as temporary entrance into theme park. Retheming of Hollywood Blvd, including facade enhancements and addition of Red Car Trolley route. Various expansion and re-theming projects. Land planned to be renamed as "Hollywoodland"
    Project Status: Hollywood Land remodeling and enhancing will begin in Phase 2.
    Open Date: Unknown
    Playhouse Disney — Live on Stage! retheme
    B]Details:[/B] Playhouse Disney will close and be re-named "Disney Junior – Live on Stage" with new shows.
    Project Status: Playhouse Disney closes January 23, 20011
    Open Date: Disney Junior opens spring 2011
    Red Car Trolley track construction
    Project Status: In progress. Began January 5, 2010
    Completion Date: Fall 2010
    Hollywood Blvd. placemaking
    Project Status: Unknown.
    Completion Date: Unknown
    Teen Live Club - Outdoor Disney Channel venue
    Project Status: Unknown
    Open Date: Unknown
    Muppet*Vision 3D replacement
    Details: Various ideas have been considered for this venue ranging from Mickey's PhilharMagic from WDW, a "flex-theatre," and a Chronicles of Narnia special effects show. Currently, Muppet*Vision will remain, and it is unknown what will eventually replace the show.
    Project Status: Unknown. Reports say Muppets will remain until 2010, at least.
    Open Date: Unknown.
    New show for Hyperion Theatre - "Toy Story – The Musical"
    Project Status: Cancelled. The DisneyParks Blog announced on December 3, 2009 that the "Toy Story" musical would replace "Aladdin – A Musical Spectacular" in 2011. "Aladdin" closes forever August 15, 2010. Then, on May 12 Disney announced Aladdin had been extended and Toy Story was essentially cancelled.
    Open Date: N/A.
    Hollywood Pictures Backlot walkway to "a bug's land"
    Details: A new guest walkway connecting the Hollywood Pictures Backlot's Tower of Terror courtyard to A Bug's Land's Flick's Fun Fair.
    Project Status: Now open. Began December 1, 2009.
    Open Date: Opened first week of January 2010
    Award Wieners dining area expansion
    Project Status: Completed
    Open Date: Opened June 2008.
    Stage 17 temporary entrance
    Project Status: Cancelled
    Open Date: Cancelled. Originally planned to open by fall 2009.




    PARADISE PIER
    Overall Project: Retheming of Pier to Victorian-style seaside amusement zone. Addition of Toy Story Midway Mania attraction. Retheming of Games of the Boardwalk, Mullholland Madness, Sun Wheel, Orange Stinger, Pizza Oom Mow Mow, and Burger Invasion. Removal of Maliboomer and Golden Dreams. Addition of Paradise Park and The Little Mermaid: Ariel's Undersea Adventure.
    Project Status: In Progress
    Project Completion/Soft Open: First phase concluded with the opening of Toy Story Midway Mania! and the surrounding area's re-theming with soft-openings in April 2008 and a official opening in July 2008. Additional phases of this project are on-going.
    Maliboomer removal
    Details: The Maliboomer will be dismantled and removed and the space formerly occupied by the attraction will be converted in a Victorian-style park area with shade trees and seating. On March 30, 2010, Al Lutz reported the Maliboomer would be closed "the day after labor day." Disney confirmed the news on August 6, 2010 via a Tweet from the official Disneyland Resort Twitter account, which included a link to a DisneyParks Blog post that discussed Cars Land and Mullholland Madness news, but nothing about the Maliboomer. The linked blog post was later edited to include the Maliboomer closure information.
    Project Status: In progress. The Maliboomer closed September 7, 2010 and was completely dismantled by mid-October. Work continues removing attraction infrastructure, queue and shade structures in the area before being re-themed as a garden area.
    Project Completion: Late 2010.
    The Little Mermaid: Ariel's Adventure and Mermaid Grotto (Includes Removal of Golden Dreams)
    Project Status: In progress. Golden Dreams closed to the public September 7, 2008 with the attraction open to school groups only through Spring 2009. Construction walls went up around Golden Dreams May 27, 2009. Originally expected to be demolished July 6, the Golden Dreams Theater demolition was delayed to July 15. The theater has since been completely removed and construction on the new attraction is in progress.
    Open Date: May 2011
    Mullholland Madness re-theme to Goofy's Sky School
    Details: Removal "Mullholland Drive" theme including street signs, highway billboards, etc. The roller coaster will get new theme inspired by the 1940 cartoon short, "Goofy’s Glider," and will become a flying academy that follows Goofy’s attempts to teach a group of novice pilots how to fly.
    Project Status: In progress after being delayed numerous times. Originally expected to start January 2010 was put on hold. On March 30, 2010, Al Lutz reported the project was scheduled to begin in October 2010 for a seven-month transformation. On August 6, the DisneyParks Blog confirmed the attraction would close October 12, 2010 (last day for guests October 11).
    Open Date: May 2011.
    California Screamin' queue / Eastern Paradise Pier re-theming
    Project Status: Delayed indefinitely.
    Open Date: Unknown
    Corn Dog Castle retheming
    Details: The quick service dining location was originally said to be undergoing a Victorian-style re-theming in order to match the surrounding area's new theme. A June 30 report from MousePlanet's David Koenig says otherwise, however, indicating the dining location will be moved from its current location and reopen at a new location in Cars Land in 2012.
    Project Status: In progress. Construction walls went up June 1, 2009
    Open Date: Cast Member publications currently list it as returning May 26, 2011, but that date may be in flux and can change, especially if rumors of a Cars Land relocation are true. In his 7/7 column, MiceAge's Al Lutz noted the Route 66 makeover being completed Summer 2010.
    Souvenir 66 retheming
    Details: Project includes retheming and renaming retail location as Seaside Souvenirs
    Project Status: In progress. Construction walls went up June 1, 2009
    Open Date: Cast Member publications currently list it as returning May 26, 2011, but that date may be in flux and can change. In his 7/7 column, MiceAge's Al Lutz noted the Route 66 makeover being completed Summer 2010.
    Paradise Pier shops re-theme.
    Details: Point Mugu Tattoo, Man Hat N Beach, and Sideshow Shirts will close and be re-themed inside and out, including new facades.
    Project Status: Previously expected begin Fall 2009, the project has yet to begin. Rumored to be indefinitely delayed. Al Lutz noted in his 11/9/10 column that the project was canceled, but that the shops and Maliboomer area may become the entrance/queue space of a future attraction.
    Open Date: Unknown
    Paradise Garden - Expanded dining courtyard
    Details: Covering the area encompassing Pizza Oom Mow Mow, Burger Invasion, and the S. S. rustworthy, the new Paradise Garden dining area will re-purpose the existing dining facilities and reuse the current S.S. rustworthy water play area for an expanded dining courtyard with Victorian-style theming in a lush garden setting.
    Open Date: Previously expected to open May 2010, the project was postponed and is now expected to officially open May 24, 2011.
    S.S. rustworthy removal
    Project Status: Completed. The east portion of the S.S. rustworthy was removed in October 2009 during Silly Symphony Swings construction. The west portion of the water play area was removed starting in September 2010 during demolition for the upcoming Paradise Garden dining area.
    Open Date: Area to re-open as part of Paradise Garden complex May 2011
    Paradise Garden Grill (Burger Invasion re-theming)
    Project Status: In progress. The former McDonald's dining location closed September 2, 2008. Construction walls went up in late June 2010 to begin construction.
    Open Date: Previously expected to open May 2010, the project was postponed and is now expected to open May 24, 2011.
    Boardwalk Pizza and Pasta (Pizza Oom Mow Mow re-theme)
    Details: The existing Pizza Oom Mow Mow dining facility will retain its pizza-and-pasta menu, but will be re-dressed with a new Victorian-style theme.
    Project Status: In progress. Previously expected to begin fall 2009, construction walls went up in the area September 7, 2010, followed by heavy demolition and building modification work throughout the fall.
    Open Date: Previously expected to open May 2010, the project was postponed and is now scheduled to open May 24, 2011.
    Jumpin' Jellyfish removal
    Project Status: Jumpin' Jellyfish was originally slated to be removed before Spring 2010 premiere of World of Color, but it may remain in place for the indefinite future.
    Completion Date: Unknown.
    Ariel's Grotto Restaurant - Retheming and conversion to "Princess Palace" dining location
    Project Status: Unknown
    Open Date: June 2011.
    Disney's World of Color Nighttime Spectacular
    Details: A 25-minute nighttime show, World of Color will transform Paradise Bay into a water-and-fire spectacular, utilizing 1,200 individual fountains, showcasing the magic of Disney animation, from classic to contemporary. More details.
    Project Status: Show opened publicly June 11, 2010, following a "blue carpet" premiere on June 10, 2010. Work on the show began November 3, 2008 with the draining of Paradise Bay, followed by construction on Monday, January 5, 2009.
    Paradise Bay refilling: Paradise Bay was scheduled to being refilling September 9, 2009 to begin show programming and testing, but refilling was delayed until October 2009. On October 15, the DisneyParks Blog said refilling would begin "soon" and that once refilling begain, Paradise Bay would be more than half-way full in three days.
    Open Date: Previously rumored to begin soft openings in March 2010 followed by a celebrity-attended grand opening event in late April, Cast Members were notified the show would open on June 11, 2010. Disney later officially announced this information on the DisneyParks Blog.
    Orange Stinger retheme to Silly Symphony Swings
    Project Status: Completed. Attraction began 'dismantling' July 14, 2009 with the decorative orange peel removal beginning the week of July 20, according to Around Disney. Scaffolding went up for new queue construction the third week of October.
    Open Date: Previously expected to open April 29, 2010, the project was delayed and finally soft opened on May 29, 2010. The official opening of the ride is scheduled for June 11, 2010.
    New games for Toy Story Midway Mania!, based on Toy Story 3
    Details: Blue Sky Disney reported on March 8 that Toy Story Midway Mania! would receive a new lineup of games themed after the upcoming Toy Story 3 film.
    Project Status: Completed.
    Open Date: The new game, Rex and Trixie's Dino Darts, debuted May 22, 2010. Additional Toy Story 3 characters are now featured throughout the attraction as well.
    Paradise Park (Disney's World of Color Viewing Area)
    Details: A new viewing area for the upcoming World of Color show is being constructed where the former Golden State Amphitheater was located, along the northern shore of Paradise Bay. The new viewing area will be multi-leveled, similar to Disneyland's Fantasmic! viewing area, and large enough to accommodate 9,000 guests per show.
    Project Status: In progress. Began Monday, January 5, 2009.
    Open Date: First delayed from its original December 18, 2009 open date Paradise Park was later scheduled to open February 20, 2010 and then again set to open in March. Walls surrounding Paradise Park are now expected to be removed Friday, April 2. Barricades will be in place, however, preventing guests from entering the area. Paradise Park finally opened to guests on April 9.
    Dinosaur Jack's Sunglass Shack removal
    Details: Sunglass store scheduled to close permanently May 26, 2009. The retail location will be removed completely.
    Project Status: Completed. Store closed May 26, 2009, construction walls went up May 27. Demolition originally scheduled to begin June 29, but began after park closing June 24, with visible progress to park guests on June 25.. The retail location was completely removed by Saturday, June 28.
    King Triton's Carousel plussing
    Details: Previous plans to build new Victorian-styled roof structure over carousel have been delayed due to cost. Rumors suggested that the carousel would get a minor re-theming and "plussing" including new paint job and new canopy cover while attraction undergoes refurbishment and technical upgrades, but current photos of the attraction say otherwise.
    Project Status: Completed May 22, 2009. Began March 9, 2009.
    Open Date: May 22, 2009
    San Francisco Street restroom construction.
    Details: New restrooms will be built in the East San Francisco Street facades so that the current restrooms in the West San Francisco Street facades can be removed to make space for The Little Mermaid attraction.
    Project Status: Now open. Opened May 15, 2009. Began January 26, 2009.
    Open Date: May 15, 2009.
    Sun Wheel/Mickey's Fun Wheel re-theme
    Project Status: Completed. Now open.
    Open Date: Originally scheduled to open April 24, opened May 4, 2009.
    California Screamin' loop re-dressing
    Details: The Mickey Mouse icon will be removed and replaced with a new sunburst icon and Paradise Pier logo.
    Project Status: Completed. Now open. Began January 2009.
    Completion Date: April 15, 2009.
    Games of the Boardwalk re-theme.
    Project Status: Now open. Began Monday, October 27, 2008, opened April 7, 2009.
    Open Date: Originally scheduled to open April 24, 2009, then rumored to be delayed to May. New information says the Games of the Boardwalk are ahead schedule and will open April 7, 2009.
    Toy Story Midway Mania!
    Project Status: Completed. Attraction now open.
    Open Date: June 17, 2008




    GOLDEN STATE
    Walt Disney Imagineering Blue Sky Cellar: Imagineering the Future - New Exhibit
    Details: Blue Sky Cellar preview center will close to change exhibits with a more in-depth preview of the upcoming Little Mermaid attraction.
    Project Status: Expect a brief closure in January before the Jan. 27 reopen date to install new exhibits.
    Open Date: Reopens January 27.
    Condor Flats retheme
    Project Status: Unknown
    Open Date: Unknown
    Soarin' Over California - New film - "Soarin' Over the World"
    Project Status: Unknown
    Open Date: 2013
    Performance Corridor Repaving
    Details: The section of the park's Performance Corridor in front of The Golden Vine Winery will be repaved, resulting in the closure of the pathway at this time. Guests traveling to/from Paradise Peir will be rerouted through the Pacific Wharf
    Project Status: Begins November 19
    Open Date: December 17
    Walt Disney Imagineering Blue Sky Cellar: Imagineering the Future - New Exhibit
    Details: Blue Sky Cellar preview center will close to remove Midway Mania, Games of the Boardwalk, etc., exhibits and replace them with new exhibits focusing on upcoming projects.
    Project Status: Closes July 10, 2009 to update exhibits.
    Open Date: Reopens July 16.
    Lucky Fortune Cookery - Asian-style restaurnt replacing former Cocina Cucamonga facility
    Details: The old Cocina Cucamonga dining facility will close and be rethemed and receive a new Asian-style menu.
    Project Status: Now open. Cocina Cucamonga closed June 18, 2009 when new, larger Cocina Cucamonga opened and then began conversion into new Lucky Fortune Cookery.
    Open Date: September 4, 2009.
    Cocina Cucamonga moves into old Lucky Fortune Cookery location.
    Details: The long-closed Lucky Fortune Cookery will be converted into an expanded Cocina Cucamonga. Cocina Cucamonga will be converted into a new, smaller Asian dining location.
    Project Status: In progress. Construction walls went up week of January 12.
    Open Date: June 18, 2009
    Walt Disney Imagineering Blue Sky Cellar: Imagineering the Future (Resort Preview Center)
    Details: Originally planned for the San Francisco Street buildings, the Blue Sky Cellar replaced the Seasons of the Vine Theater. Exhibits planned to rotate every 6-8 months.
    Project Status: Now open.
    Open Date: Annual Passholder Previews October 16-19. Open to public October 20, 2008.




    CARS LAND
    Overall Project: Utilizing 12 acres of the former Timon Parking Lot, this is new land will feature three new attractions including a major new "E"-Ticket attraction, Radiator Springs Racers, as well as new shopping and dining experiences themed to Disney-Pixar's Cars
    Project Status: In progress. Walt Disney Imagineering officially broke ground on the Cars Land project July 8, 2009, according to the July 9 MiceAge.com Editor's Note by Al Lutz.
    Open Date: June 2012

    Bountiful Valley Farm
    Details: Technically a portion of A Bug's Land, the Bountiful Valley Farm area which includes the Bountiful Valley Farmers Market, Sam Andreas Shakes and some educational displays on California farming will close for the massive Cars Land project. The space occupied by Bountiful Valley Farm will be used for the Mater's Junkyard Jamboree attraction as well as the main entrance for Cars Land.
    Project Status: On August 6, 2010, the DisneyParks Blog announced Bountiful Valley Farm will close September 7, 2010, at which time demolition of the Farm area will begin.
    Mater's Junkyard Jamboree
    Project Status: Bountiful Valley Farm will close September 7 to begin demolition on the area which will used for the Junkyard Jamboree attraction.
    Open Date: 2012
    Radiator Springs Racers
    Project Status: In progress. A portion of test track has been constructed and is undergoing testing now.
    Open Date: By 2012
    Luigi's Roamin' Tires
    Project Status: In progress.
    Open Date: By 2012
    Flo's Restaurant
    Project Status: In progress.
    Open Date: By 2012
    Fillmore's Organic Foods
    Project Status: Unknown
    Open Date: By 2012
    Radiator Springs Curios
    Project Status: Unknown
    Open Date: By 2012
    Cars Land Drive-In Restaurant
    Project Status: On indefinite hold. Possibly to be built in Phase 2 expansion.
    Open Date: Unknown
    Timon Parking Lot - Closure
    Details: The Timon Parking Lot will close permanently to make room for the upcoming Cars Land expansion as well as additional backstage construction.
    Project Status: Closed July 6, 2009. Cars Land officially broke ground July 8.
    Last edited by MasterGracey; 01-05-2011 at 10:25 PM. Reason: 12/21: Updated info about Performance Corridor, Pixar Play Parade changes, and Blue Sky Cellar

    Photos, news, and commentary every week from Walt Disney's Magic Kingdom!

    | | |

  2. #2

    • Banned User
    • Offline

    Join Date
    Feb 2010
    Posts
    576

    Re: Disney California Adventure Project Tracker X

    Yeahh!! great new information. made my night.

  3. #3

    • Member
    • Offline

    Join Date
    Sep 2009
    Posts
    389

    Re: Disney California Adventure Project Tracker X

    2nd poster! YAY! Sooo.. World of Color...?
    Do do do do do do dodododododo!

    -My Electrical Parade Impersonation

  4. #4

    • Banned User
    • Offline

    Join Date
    Aug 2008
    Location
    Northern California
    Posts
    4,272

    Re: Disney California Adventure Project Tracker X

    Great new Project Track Master Gracey. I always appreciate these.

  5. #5

    • Addicted to MC since '08
    • Offline

    Join Date
    Apr 2008
    Location
    on MC
    Posts
    1,817

    Re: Disney California Adventure Project Tracker X

    Thank you very much!

  6. #6

    • Member
    • Offline

    Join Date
    Feb 2006
    Location
    Los Angeles
    Posts
    86

    Re: Disney California Adventure Project Tracker X

    About time!!! Yay!

  7. #7

    • Once upon a dream
    • Offline

    Join Date
    Oct 2009
    Location
    A place called California!
    Posts
    622

    Re: Disney California Adventure Project Tracker X

    Thanks!


    Thank you Solitary!

  8. #8

    • =)
    • Offline

    Join Date
    Aug 2005
    Posts
    13,290

    Re: Disney California Adventure Project Tracker X

    Stickied! Should the previous tracker be...unstuck?


  9. #9

    • Member
    • Offline

    Join Date
    Sep 2009
    Posts
    389

    Re: Disney California Adventure Project Tracker X

    Maybe you should wait a day or two for everyone to be caught up with the other one and then unstick it? IDK, what usually happens in these situations?
    Do do do do do do dodododododo!

    -My Electrical Parade Impersonation

  10. #10

    • Banned User
    • Offline

    Join Date
    Feb 2010
    Posts
    576

    Re: Disney California Adventure Project Tracker X

    Just let it die off

  11. #11

    • Addicted to MC since '08
    • Offline

    Join Date
    Apr 2008
    Location
    on MC
    Posts
    1,817

    Re: Disney California Adventure Project Tracker X

    Noticed MG decided to put Disney California Adventure in the title.

    I guess he should though because that IS the name of the park now.

    Stupid me.

  12. #12

    • Member
    • Offline

    Join Date
    Apr 2010
    Location
    San Diego
    Posts
    756

    Re: Disney California Adventure Project Tracker X

    Nice.

  13. #13

    • MiceChat Moderator
    • Starcruiser.. crash crash
    • Offline

    Join Date
    Sep 2005
    Location
    Los Angeles & Orange County
    Posts
    21,402

    Re: Disney California Adventure Project Tracker X

    Shouldn't the Toy Story Musical and Muppet Vision sections be updated? Narnia is definitely not going to be a part of this park anymore and Toy Story Musical is cancelled.


    Visit my mice chat toy shop!
    http://micechat.com/forums/merchandi...oy-shoppe.html

    Track Disney Animation Presence in the Theme Parks Worldwide!
    http://micechat.com/forums/disneylan...ired-them.html

  14. #14

    • All-American
    • Offline

    Join Date
    Feb 2009
    Location
    Indiana, 1719 miles from DL
    Posts
    1,902

    Re: Disney California Adventure Project Tracker X

    Yay! A new project tracker! Good thing too, the last one was getting a bit lengthy.

    After rereading the first post, does anyone know if the new Partners-style statue is still on? I was really looking forward to that, but heard a rumor it wasn't happening...


  15. #15

    • King of Los Angeles
    • Offline

    Join Date
    Feb 2005
    Posts
    1,023

    Re: Disney California Adventure Project Tracker X

    Woo Hoo...Reading that Maliboomer is scheduled to be removed so soon, and that the shops next to it are delayed indefinitely makes me wonder if Disney has something in the works for this pad in phase 2....It seems like the two decisions shifted around the same time. I wonder what the bigger plan is here. Hopefully something good.

Page 1 of 663 1234112651101501 ... LastLast

Similar Threads

  1. [News] Disney's California Adventure Project Tracker IX
    By MasterGracey in forum Disneyland Resort
    Replies: 11538
    Last Post: 06-06-2010, 09:10 PM
  2. [News] Disney's California Adventure Project Tracker VII
    By MasterGracey in forum Disneyland Resort
    Replies: 2994
    Last Post: 10-16-2009, 08:48 PM
  3. [News] Disney's California Adventure Project Tracker IV
    By MasterGracey in forum Disneyland Resort
    Replies: 2018
    Last Post: 05-03-2009, 05:37 PM
  4. [News] Disney's California Adventure Project Tracker III
    By MasterGracey in forum Disneyland Resort
    Replies: 2074
    Last Post: 04-04-2009, 02:12 AM
  5. [News] Disney's California Adventure Project Tracker
    By MasterGracey in forum Disneyland Resort
    Replies: 2043
    Last Post: 10-10-2008, 09:12 PM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •