  1. #451

    • Autobot Weapon Specialist
    • Offline

    Join Date
    Jun 2005
    Location
    Santa Ana, CA
    Posts
    6,230

    Re: Disneyland Resort Project Tracker 4.0

    Quote Originally Posted by mickey11 View Post
    ^If they are going to re-profile the ride, they could be in the way.
    There's def. not enough room to add anything significant to the ride layout, especially in that back corner which is already occupied by track.

    Quote Originally Posted by dfan07 View Post
    From today:
    Thanks for the update pics dfan!


  2. #452

    • Member
    • Offline

    Join Date
    Apr 2008
    Posts
    292

    Re: Disneyland Resort Project Tracker 4.0

    Quote Originally Posted by k_peek_2000 View Post
    There's def. not enough room to add anything significant to the ride layout, especially in that back corner which is already occupied by track.



    Thanks for the update pics dfan!
    Again, if they are going to re-profile the ride: Meaning they will be moving things around, that could be a reason they are on the chopping block. A re-profile could mean anything. We know for sure they are completely replacing the track, maybe the new ride needs a wider turn into the break run, and the facades will be removed. Who knows till its done, that's what I was saying.

  3. #453

    • Member
    • Offline

    Join Date
    Jun 2010
    Posts
    414

    Re: Disneyland Resort Project Tracker 4.0

    Quote Originally Posted by mickey11 View Post
    Again, if they are going to re-profile the ride: Meaning they will be moving things around, that could be a reason they are on the chopping block. A re-profile could mean anything. We know for sure they are completely replacing the track, maybe the new ride needs a wider turn into the break run, and the facades will be removed. Who knows till its done, that's what I was saying.
    I didn't see anything about re-profiling the track. As I see it, they will be UPGRADING the track (same profile), upgrading ageing show elements and enhancing safety systems.

    The work on the show elements may just indicate that they will be REPLACING those Rainbow Ridge buildings that have deteriorated due to age.

  4. #454

    • film975
    • Offline

    Join Date
    Oct 2010
    Location
    Fullerton, CA
    Posts
    1,440

    Re: Disneyland Resort Project Tracker 4.0

    Quote Originally Posted by jmuboy View Post
    The MousePlanet discussion boards are reporting that Rainbow Ridge will go away during the Big Thunder Rehab in 2013.

    http://mousepad.mouseplanet.com/entry.php?1038-The-Demolition-of-Rainbow-RidgeI
    I highly doubt that Tony Baxter would let this happen to his ride.

  5. #455

    • Disneyland > Disney World
    • Offline

    Join Date
    Dec 2010
    Location
    That place next to Seattle
    Posts
    138

    Re: Disneyland Resort Project Tracker 4.0

    Walls have finally come down in the DCA entrance planter! It's about time too. https://twitter.com/thedisneyresort/...20242400788481
    Marvel + Disney =

  6. #456

    • Autobot Weapon Specialist
    • Offline

    Join Date
    Jun 2005
    Location
    Santa Ana, CA
    Posts
    6,230

    Re: Disneyland Resort Project Tracker 4.0

    The expansion is now officially over!!!!!!!!


  7. #457

    • Future Imagineer
    • Offline

    Join Date
    Jul 2010
    Location
    In some place dark and creepy. Help!
    Posts
    451

    Re: Disneyland Resort Project Tracker 4.0

    Quote Originally Posted by k_peek_2000 View Post
    The expansion is now officially over!!!!!!!!
    For now
    Met Anna and Elsa over 1100 times and not afraid to admit it. Just let it go

    My YouTube account: http://www.youtube.com/user/ThomasTheImagineer


  8. #458

    • Autobot Weapon Specialist
    • Offline

    Join Date
    Jun 2005
    Location
    Santa Ana, CA
    Posts
    6,230

    Re: Disneyland Resort Project Tracker 4.0

    Quote Originally Posted by Right Ear View Post
    For now
    Phase 1 is complete.


  9. #459

    • Minion
    • Offline

    Join Date
    Jul 2010
    Location
    Las Vegas
    Posts
    1,063

    Re: Disneyland Resort Project Tracker 4.0

    Check off phase one lol


    It's a music Celebration
    Come on, come on, come on
    Strike up the band,
    Feel the beat, what a great sensation
    Come on, come on, come on
    Move and clap your hands,
    Get into the Spirit
    Let everyone hear it,
    So come on, come on


    Step into the Magic
    Watch the stories come alive
    Step into the Magic
    Every color shines so bright
    Step into the Magic!!!!

    -Disneyland Forever Fireworks

  10. #460

    • Minion
    • Offline

    Join Date
    Jul 2009
    Posts
    2,169

    Re: Disneyland Resort Project Tracker 4.0

    Pics from Yesterday:


    IMG_2717 by socal_ron, on Flickr


    IMG_2719 by socal_ron, on Flickr


    IMG_2999 by socal_ron, on Flickr


    IMG_3001 by socal_ron, on Flickr


    IMG_3002 by socal_ron, on Flickr


    IMG_3016 by socal_ron, on Flickr


    IMG_3017 by socal_ron, on Flickr


    IMG_3018 by socal_ron, on Flickr


    IMG_3025 by socal_ron, on Flickr


    IMG_3026 by socal_ron, on Flickr

    ---------- Post added 11-18-2012 at 01:07 PM ----------

    Over at the theater:


    IMG_3177 by socal_ron, on Flickr

    ---------- Post added 11-18-2012 at 01:13 PM ----------

    Over by the back of BTMRR some very rotten wood. If there is wood like this in the old Rainbow Ridge set, it might explain why it has to come down:


    IMG_2950 by socal_ron, on Flickr


    IMG_2951 by socal_ron, on Flickr

    ---------- Post added 11-18-2012 at 01:30 PM ----------

    The new railings at Casey Jr. viewed from Storybook Land (dang, I was just one boat off from being in Pat's boat):


    IMG_2962 by socal_ron, on Flickr


    IMG_2963 by socal_ron, on Flickr


    IMG_2965 by socal_ron, on Flickr


    IMG_2967 by socal_ron, on Flickr


    IMG_2968 by socal_ron, on Flickr


    IMG_2979 by socal_ron, on Flickr


    IMG_2981 by socal_ron, on Flickr


    IMG_2983 by socal_ron, on Flickr


    IMG_2985 by socal_ron, on Flickr

    No railings on the lower bridge on the far end:

    IMG_2989 by socal_ron, on Flickr

    ---------- Post added 11-18-2012 at 01:34 PM ----------

    And the most important news, the return of Little Harold:


    IMG_2994 by socal_ron, on Flickr


    IMG_2995 by socal_ron, on Flickr

  11. #461

    • film975
    • Offline

    Join Date
    Oct 2010
    Location
    Fullerton, CA
    Posts
    1,440

    Re: Disneyland Resort Project Tracker 4.0

    Hmm... that new safety railing on Casey Junior doesn't look half as bad as some have feared. Looks like they tried to make it blend with the scenery as much as possible. Unlike the eye sore over at Alice in Wonderland. I wonder when they will finally work on that one.

  12. #462

    • Light up the HALO!
    • Offline

    Join Date
    Jun 2009
    Location
    Sparks, NV
    Posts
    360

    Re: Disneyland Resort Project Tracker 4.0

    The new safety railings don't look bad in person. Im glad they turned out the way they did. I was also pleased to see Casey Jr. going his normal speed again. For a little over two years he was driving increadably slow leading to big gaps in the music tracks but on friday and saturday, he was going faster than I ever remember. The audio gaps were short and dumbos triumph lasted past the alps all the way to under the second bridge.

    One strange thing was both friday and saturday they were not using the wild animal cage.
    As we say to the animals, that's the end of the lion.

    RACE THROUGH THE UNIVERSE, CAREEN THROUGH THE STARS.

    Space Mountain





  13. #463

    • New Member Goes Forth
    • Offline

    Join Date
    Oct 2011
    Location
    Burwell, Norfolk, United Kingdom, United Kingdom
    Posts
    535

    Re: Disneyland Resort Project Tracker 4.0

    I know i'm late for this (heavy work and all) but

    DCA EXPANSION IS FISNISHED

    I think there is nothing wrong with the casey junior handrails, they look fine, but how long before peopl complain. I gues we have to ait for this weeks Dateline Disneyland
    The new Star Wars plot summery:

    Episode 7: Luke discovers that Darth Vader is not his father, and goes on a search for his real father

    Episode 8: Darth Vader is resurrected and goes on Jerry Springer, claiming he is Luke and Leia's father

    Episode 9: Princes Leia is not Luke's sister, making him furious (we all know why...).

  14. #464

    • Member
    • Offline

    Join Date
    Aug 2009
    Location
    San Jose, CA
    Posts
    462

    Re: Disneyland Resort Project Tracker 4.0

    BTMRR is not close yet correct?

  15. #465

    • Under that tree again!
    • Offline

    Join Date
    Nov 2011
    Posts
    7,496

    Re: Disneyland Resort Project Tracker 4.0

    Quote Originally Posted by d1mex View Post
    BTMRR is not close yet correct?
    No, its refurbishment begins after the Holidays. Planned to close January 7th.



    Also new closures that have been announced.

    Jan. 22- 23, 2013: Davy Crockett Explorer Canoes will be closed for refurbishment. Jan. 22 – Feb. 28, 2013: it’s a small world will be closed for refurbishment.
    Jan. 22 – Feb. 14, 2013: Splash Mountain will be closed for refurbishment.
    Jan. 28 – Feb 8, 2013: Café Orleans will be closed for refurbishment.
    Jan. 28 – 31, 2013: Guide 1 (West) will be closed for refurbishment.
    Jan. 28 – Feb. 14, 2013: Mad Tea Party will be closed for refurbishment.


    and in DCA

    Jan. 28 – 31, Feb. 4-7, 2013: World of Color will not be presented.

Similar Threads

  1. [News] Disneyland Resort Project Tracker II
    By MasterGracey in forum Disneyland Resort
    Replies: 3917
    Last Post: 08-16-2011, 03:37 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •