Can somebody refresh me memory and tell me when they are filling the Sub Lagoon back up? It is supposed to be in December right?
Can somebody refresh me memory and tell me when they are filling the Sub Lagoon back up? It is supposed to be in December right?
I think Darkbeer said it was supposed to be in October, who knows?
-JackDoc Brown had 2 Deloreans!
As the guy that replaced Oimett - he should know. HAH!![]()
I think they're waiting for the snow on the Matterhorn to melt.
It looked realy colorfull from the matterhorn. But, there was still a lot of construction material down there that would need to be cleaned up before it could be filled.
yea, not anytime soon, there is still a lot of junk in there from construction, will most likely take a while to clear it out.
I'm imagineering a new signature for your future enjoyment!
The lagoon will be test filled in January, it will then be drained for final details and more construction. It will be filled once more before the official opening.
Either way, it will be LOVELY to get those walls off... even if I never want to fight the Peter Pan-like lines it will have.
Does anyone know if they keep the water they drain or do they dump it every time? It seems like a massive waste of water to fill it up, drain it, then fill it up again.
Isn't that paint they are using on the lagoon floor much more likely to stand up against the sun and chlorine in the water than what they had used before? How often did they drain the old sub ride before it was closed and left to sit for YEARS?
I cant wait. The subs used to be my favorite ride when I was little. My mom eventually stopped letting me go on it because she would have to go with me and when she went on the ride, she felt claustrophobic (or however the hell you spell it).
Take me to Neverland...
We're expecting a good size rain storm this weekend. I predict that the lagoon will fill up sooner than later.
This has been a Filmways presentation dahling.
Bookmarks